Infinite Renewables Group | ADEPT
52
portfolio_page-template-default,single,single-portfolio_page,postid-52,qode-listing-1.0.1,qode-social-login-1.0,qode-news-1.0,qode-quick-links-1.0,qode-restaurant-1.0,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-12.1,qode-theme-bridge,bridge,wpb-js-composer js-comp-ver-5.4.2,vc_responsive
 

ADEPT

ADEPT is a power management and optimisation platform that was developed by Infinite Renewables in collaboration with GS Yuasa, Sheffield University and Swanbarton with the support of a £500k Innovate UK grant. The containerised platform integrates multi technology renewable generation, battery storage and smart metering to provide multi-control solutions. The ADEPT platform at GS Yuasa’s site on Rassau Industrial Estate in Ebbw Vale is due for completion in Q4 2018.

Date